﻿_id	No.	Job description	Highway	Control episode	Episode/Project Name	Operation km(start/end)	Direction	Actual km. distance output	Distance/2 traffic lanes	Quantity of work (places)	Budget
1	1	Electrical lighting and traffic signal repair work	"3
"	"0401
"	Chonburi - Si Racha 4	((95+080,100+200+,5+700,99+100)/(95+081,100+201,112+201,95+701,99+101))	LT+RT	0.01	0.01	5	19,969,000.00
2	2	Dangerous guardrail work	3	402	Si Racha - Pattaya 1	(122+544)/(123+100)	LT+RT	0.56	1.67	1	24,945,300.00
3	3	Electrical lighting and traffic signal repair work	"3
"	"0402
"	Si Racha - Pattaya 2	(124+363,124+847,128+300,135+000)/(124+363,124+848,128+301,135+001)	LT+RT	0.01	0.01	4	15,879,700.00
4	4	Traffic sign work	36	102	Ban Pong - Makham Khu	(17+200)/(17+201)	LT+RT	0.01	0.01	1	4,992,400.00
5	5	A.t restore the highway network connecting the regions	"331
"	"0101
"	Sattahip - Khao Baisi	(1+500,3+000)/(1+800,4+000)	LT+RT	1.3	2.6	1	23,508,221.14
6	6	"
Asphalt surface enhancement work"	331	101	Sattahip - Khao Baisi	(2+300)/(2+879)	LT+RT	0.58	1.16	12,740	5,544,400.00
7	7	"
Asphalt surface enhancement work"	331	102	Khao Baisi - Phan Sadet Nok 1	(11+800)/(12+795)	LT+RT	1	1.99	26,140	11,037,416.14
8	8	"
Asphalt surface enhancement work"	331	102	Khao Baisi  - Phan Sadet Nok 2	(17+160)/(20+525)	RT	3.37	6.73	39,430	14,992,395.02
9	9	A.t improve safety at dangerous intersections	"331
"	"0102
"	Khao Baisi - Phan Sadet Nok 	(39+516,41+679)/(39+517,41+680)	LT+RT	0.01	0.01	2	13,237,198.00
10	10	Traffic sign work	331	102	Khao Baisi - Phan Sadet Nok 2	(43+300)/(43+301)	LT+RT	0.01	0.01	1	4,991,700.00
11	11	Electrical lighting work	331	103	Phan Sadet Nok - Nong Prue	(50+050)/(50+051)	LT+RT	0.01	0.01	1	1,846,900.00
12	12	Raising standards for prevention of dangers on the side of highways	332	100	long beach - Thung Prong	(1+075)/(3+580)	LT+RT	2.51	5.01	1	5,497,700.00
13	13	Highway development work through community areas	3240	101	Nong Prue - Tabaek Office	(4+151)/(5+565)	LT+RT	1.05	1.05	1	28,371,000.00
14	14	Construction work to increase highway efficiency	3240	101	Nong Prue - Tabaek Office	(8+760)/(10+140)	LT+RT	1.38	1.38	1	15,653,000.00
15	15	Asphalt surface restoration work	3241	101	Si Racha - Nong Kho Reservoir 	(4+525)/(6+000)	LT+RT	1.48	2.95	30,990	14,880,666.40
16	16	Electrical lighting work	3241	101	Si Racha - Nong Kho Reservoir 2	(6+930)/(8+130)	LT+RT	1.2	3.26	1	1,697,400.00
17	17	Electrical lighting work	3241	102	Nong Kho Reservoir - Map lang 2	(15+150)/(16+725)	LT+RT	1.58	1.58	1	1,996,800.00
18	18	Asphalt surface enhancement work	"3241
"	"0102
"	Nong Kho Reservoir - Map lang 	(18+700,21+683)/(19+950,22+563)	LT+RT	2.13	2.13	25,570	9,994,000.00
19	19	Asphalt surface restoration work	"3574
"	"0100
"	Map Pu - khaokhansong	(3+000,5+663)/(3+475,6+030)	RT,LT+RT	0.84	1.68	13,210	11,478,081.68
20	20	Electrical lighting and traffic signal repair work	3574	100	Map Pu - khaokhansong	(6+025)/(6+026)	LT+RT	0.01	0.01	1	4,089,000.00
21	21	Raise the level of safety at U-turn points to the same level.	3576	100	Nong Kha - Chan Ta Then Waterfall	(0+000)/(1+250)	LT+RT	1.25	1.25	1	3,835,924.89
22	22	Asphalt surface enhancement work	"3701
3701"	"0500
0501"	 Khiri Nakhon Interchange - Pattaya 1	(114+211,144+211)/(115+986,115+986)	LT+RT	1.78	1.78	20,530	8,838,300.00
23	23	Asphalt surface enhancement work	3702	501	Khiri Nakhon  - Mabprachan Interchange	(88+807)/(92+740)	LT,LT+RT	3.93	3.93	43,340	17,692,500.00
24	24	Improve safety at large intersections	3702	500		(96+575)/(97+100)	LT+RT	0.53	0.53	1	14,990,000.00
25	25	Asphalt surface enhancement work	"3702
3702
3702"	"0500
0500
0501"	Khiri Nakhon Interchange - Pattaya 2	(101+530,106+085,101+530)/(103+000,106+975,106+975)	RT,RT,LT+RT	2.36	2.36	26,820	10,377,857.05
26	26	Asphalt surface enhancement work	"3702
3702"	"0500
0501"	Khiri Nakhon Interchange - Pattaya 3	(109+350,109+350)/(113+450,113+450)	RT,LT+RT	4.1	4.1	46,880	17,636,868.27